West Lucas Road Reconstruction to 4-Lane Divided Project (Country Club Road to Southview Drive)

Managing Agency

Texas Department of Transportation (TxDOT)

The TxDOT Dallas District plans, designs, builds, operates, and maintains the state transportation system in the following counties:  Collin, Dallas, Denton, Ellis, Kaufman, Navarro and Rockwall.  The TxDOT Collin County Area Office led by Area Engineer Jennifer Vorster, PE, is responsible for all TxDOT work within Collin County.

Contact Information

City of Lucas Public Works/Engineering    Scott Holden, PE          972-912-1208       [email protected]

TxDOT Site Manager                                      John D. Hudspeth, PE     214-320-6146       [email protected]

TxDOT Collin County Area Office              Jennifer Vorster, PE      972-542-2345        [email protected]

TxDOT Control Section Job (CSJ) Number: 139201048

More details are also available online at the TxDOT Project Tracker by following this link: TxDOT Project Tracker

Background Information

The West Lucas Road construction project is an expansion project of the existing two-lane roadway to a four-lane roadway. Upon completion, the new roadway will have occasional dedicated turning lanes and allow for better flow of traffic on the roads it connects. The project area will include all of the roadway east of Country Club Road to the intersection of FM 1378 / FM 3286 (Bait Shop Intersection). Planning for this project is still underway, with designs being done by BCC Engineering. More updates will be provided on this page as the project moves forward.

Project Area

Project Funding

Project Funding - TxDOT Connect

Category FS - Feasibility Study (FEAS): $3,000,000.00

  • Project Engineering: $760,151.57

Last Updated: March 28, 2024